UCONN 2000
The University of Connecticut is renewing, rebuilding and enhancing its campuses through a $2.3 billion, 20-year State investment in the University’s infrastructure. The program, known as UCONN 2000, is also enhancing our academic and research activities on all of our campuses, including the UConn Health Center in Farmington.
Project Budget List (as of 11/5/09)
Storrs & Regional Campuses:
| |
Project # |
Phase |
Approved |
Budget |
Primary $ Source |
| Agricultural Biotechnology & Advanced Technology Building Code Remediation Project |
201409 |
|
12/4/07 |
$964,307 |
Plant Funds |
| Aquatics Facility-Renovations to Atwater Pathobiology Building |
201441 |
|
6/24/08 |
$1,200,000 |
Research Funds |
| Arjona and Monteith (new classroom buildings) |
901126 |
|
9/22/09 |
$95,000,000 |
UCONN 2000 |
| Atwater Exterior Window Replacement |
901397 |
|
9/23/08 |
$650,000 |
DM |
| Atwater Pathobiology Fire Alarm Replacement |
901514 |
|
6/23/09 |
$510,000 |
Plant Funds |
| Avery Point Campus Undergraduate & Library Building - Phase I |
901278 |
|
6/23/09 |
$6,800,000 |
UCONN 2000 |
| Avery Point Campus Undergraduate & Library Building - Roof and Exterior Building Envelope and Masonry Repairs |
901525 |
|
8/4/09 |
$573,000 |
UCONN 2000 |
| Backfeed Loop-North Eagleville to Parking Garage to Storrs Road |
901416 |
|
9/23/08 |
$700,000 |
DM |
| Beach Hall Renovation of Rooms 245 and 246 |
901254 |
|
9/22/09 |
$930,000 |
DM & Operating |
| Beach Hall Renovations - Phase I |
901273 |
|
4/21/09 |
$1,500,000 |
UCONN 2000 |
| Benton State Art Museum Addition |
901263 |
|
4/21/09 |
$1,700,000 |
UCONN 2000 |
| Benton State Art Museum Addition-Mechanical System Improvements |
901545 |
|
8/4/09 |
$1,700,000 |
UCONN 2000 |
| Biobehavioral Complex Replacement (Renovation) |
901380 |
|
6/24/08 |
$2,000,000 |
UCONN 2000 |
| Bishop Renovation |
901387 |
|
9/23/08 |
$6,000,000 |
UCONN 2000 |
| Budds Building Window Replacement |
901377 |
|
6/24/08 |
$650,000 |
DM |
| Castleman Building Drainage Repair |
901289 |
|
9/25/07 |
$500,000 |
DM |
| Central Utility Plant Emergency Generator System |
901197, 901194, 901195 |
|
1/12/09 |
$2,000,000 |
DM |
| Charter Oak Corrective Action Plan - Phase II |
201399 |
|
9/26/06 |
$860,000 |
Plant Funds |
| Charter Oak Suites-Attic Sprinkler Installation |
201323 |
|
11/14/06 |
$1,000,000 |
Plant Funds |
| Code Safety Inspections-Summer 2007, Corrective Action |
901262 |
|
9/25/07 |
$2,200,000 |
DM |
| Compost Facility |
901268 |
|
6/23/09 |
$670,000 |
DM |
| CSST Gas Piping Replacement |
901515 |
|
6/23/09 |
$550,000 |
Departmental Funds |
| East Campus Steam & Condensate Piping Replacement @ Avery Point Campus |
901198 |
|
4/15/08 |
$2,085,000 |
DM |
| Engineering Building - Planning and Design |
901376 |
|
6/24/08 |
$1,000,000 |
UCONN 2000 |
| Facilities Condition Analysis (FCA) |
901170 |
|
5/15/06 |
$800,000 |
DM |
| Family Studies (DRM) Renovations - Elevator Replacement |
901365 |
|
3/10/09 |
$787,5000 |
UCONN 2000 |
| Family Studies (DRM) Renovation - Window Replacement and Facade Repair |
901293 |
|
6/23/09 |
$2,193,240 |
UCONN 2000 |
| Farm Buildings Repairs/Replacement-Roof, Facade and Other Repairs |
901366 |
|
9/23/08 |
$2,000,000 |
UCONN 2000 |
| Fine Arts Phase II - Master Plan |
901369 |
|
8/4/09 |
$1,050,000 |
UCONN 2000 |
| Fine Arts Phase II-Photo Lab Ventilation Improvements |
901544 |
|
11/5/09 |
$700,000 |
UCONN 2000 |
| Fire Alarm Upgrade in the Graduate Student Residences |
901271 |
|
12/4/07 |
$754,948 |
DM |
| Fire Alarm Upgrade in the West Campus Residences |
901270 |
|
12/4/07 |
$498,273 |
DM |
| Floriculture Greenhouse |
901367 |
|
9/22/09 |
$5,000,000 |
UCONN 2000 |
| Gant Building Renovations - Phase I |
901374 |
|
11/5/09 |
$560,000 |
UCONN 2000 |
| Gant IMS Fire Alarm Replacement |
201502 |
|
6/23/09 |
$1,122,000 |
Plant Funds |
| Gentry Completion |
901280 |
|
4/21/09 |
$10,000,000 |
UCONN 2000 |
| Gulley Hall Drainage |
901407 |
|
6/23/09 |
$400,000 |
DM |
| Gulley Hall Roof and Structural Repair |
901181 |
|
12/4/07 |
$630,000 |
DM |
| Hawley Armory Facade and Interior Repairs |
901182 |
|
4/15/08 |
$2,720,000 |
DM |
| Heating Plant Upgrade - Cogeneration Facility |
900886 |
|
4/12/05 |
$81,900,000 |
Lease |
| Hilltop Apartments Corrective Action Plan |
201315 |
|
8/2/05 |
$14,874,500 |
Plant Funds |
| Hilltop Apartments Corrective Action Plan-Phase II |
201368 |
|
6/20/06 |
$9,700,000 |
Plant Funds |
| Hilltop Apartments Corrective Action Plan - Phase III |
201405 |
|
12/4/07 |
$977,252 |
Operating Funds |
| Historic House Renovations - Phase I |
901432 |
|
9/23/08 |
$1,400,000 |
DM |
| Human Development Building Parking Lot Improvements |
901378, 901418 |
|
6/23/09 |
$505,000 |
DM |
| Installation of Filter Press |
901368 |
|
6/23/09 |
$850,000 |
DM |
| Interior Remediation, Demolition & Removal of Pharmacy Buildings |
901172 |
|
6/19/07 |
$1,105,832 |
DM |
| Intramural, Recreational & Intercollegiate Facilities |
201188 |
|
9/26/06 |
$48,777,660 |
UCONN 2000 |
| Intramural, Recreational and Intercollegiate Facilities - Recreation Center |
901332 |
|
6/24/08 |
$3,300,000 |
UCONN 2000 & Operating |
| Jorgensen Renovation - Fire Alarm Replacement |
901506 |
|
4/21/09 |
$825,000 |
UCONN 2000 |
| Jorgensen Renovation - Phase I |
901274 |
|
4/21/09 |
$1,375,000 |
UCONN 2000 |
| Koons Hall Renovation/Addition - Windows, Facade and Mechanical |
901379 |
|
6/24/08 |
$1,000,000 |
UCONN 2000 |
| Lakeside Renovation |
901105 |
|
4/11/06 |
$5,237,231 |
UCONN 2000 |
| Landfill Closure |
900748 |
|
6/23/09 |
$28,123,049 |
DM |
| Law School Renovations/Improvements-Facade Restoration |
901169 |
|
9/23/08 |
$22,130,113 |
UCONN 2000 & State Bonds |
| Law School Renovations/Improvements-Hartranft Elevator |
901131 |
|
8/2/05 |
$1,095,600 |
UCONN 2000 |
| Library Storage Facility (Project Cancelled) |
901267 |
|
6/24/08 |
$0 |
|
| Lightning and Grounding Protection for Hilltop Apartments and Charter Oak Suites |
901350 |
|
6/23/09 |
$715,000 |
Departmental Funds |
| Mansfield Road Realignment |
901206 |
|
11/5/09 |
$2,000,000 |
DM & Plant Funds |
| Mansfield Training School Improvements (Phase II) - Longley Renovations |
901281 |
|
9/25/07 |
$1,000,000 |
UCONN 2000 |
| Mansfield Training School Improvements (Phase II) - Merritt Building |
901213 |
|
6/24/08 |
$3,250,000 |
UCONN 2000 |
| Mansfield Training School Improvements - Existing Condition Survey and Master Planning (Buildings and Infrastructure) |
901370 |
|
6/24/08 |
$600,000 |
UCONN 2000 |
| Meter Installation - Multiple Locations |
901193 |
|
9/26/06 |
$600,000 |
DM |
| Meter Installation-Multiple Locations (Phase II) |
901326 |
|
1/22/08 |
$600,000 |
DM |
| Meter Installation - Multiple Locations (Phase III) |
901371 |
|
6/23/09 |
$600,000 |
DM |
| Natural History Museum Completion |
901124 |
|
9/26/06 |
$1,022,997 |
UCONN 2000 |
| Nayden Clinic Relocation (2nd Revised) |
901166 |
|
8/21/08 |
$892,000 |
DM |
| New 16" Water Main-Towers to Glenbrook and North Eagleville |
901422 |
|
8/4/09 |
$1,060,000 |
DM |
| North Hillside Road Completion (2nd Revised) |
900965 |
|
6/24/08 |
$14,300,000 |
UCONN 2000 & Federal |
| North Hillside Road Tennis Courts |
201316 |
|
8/2/05 |
$900,000 |
Departmental Funds |
| Northwest Quad Code Remediation |
201413 |
|
8/21/08 |
$706,650 |
Operating Funds |
| Old Central Warehouse |
901266 |
|
6/24/08 |
$10,000,000 |
UCONN 2000 |
| OSFM Fine Arts Complex Code Correction |
901175 |
|
6/23/09 |
$957,738 |
Plant Funds |
| OSFM Law School Code Remediation-Hosmer (Chase) Hall |
901249 |
|
1/12/09 |
$590,000 |
DM |
| OSFM Legacy Code Remediation |
901259 |
|
6/23/09 |
$8,550,000 |
Plant Funds |
| Parking Garage Repair and Upgrade |
901410 |
|
4/21/09 |
$1,305,000 |
DM |
| Phase I of the Fire Alarm Upgrade Project |
901174 |
|
6/20/06 |
$2,300,000 |
DM |
| Psychology Building Renovation/Addition |
901388 |
|
9/23/08 |
$20,000,000 |
UCONN 2000 |
| Psychology Fire Alarm Replacement |
201495 |
|
6/23/09 |
$506,000 |
Plant Funds |
| Public Safety Security Garage and Storage Facility |
901384 |
|
6/23/09 |
$568,311 |
DM |
| Recreational Sport Field Repair/Replacement - Depot Campus |
201439 |
|
3/10/09 |
$867,900 |
Departmental Funds |
| Repair & Renovation of Avery Point Pool & Gym Facility |
901173 |
|
5/14/07 |
$3,145,273 |
DM |
| Repair & Renovation of the Sherman Athletic Complex |
901243 |
|
1/22/08 |
$2,641,824 |
DM & Departmental |
| Replacement of Chemical House (Well Water Treatment Facility) |
901320 |
|
11/5/09 |
$3,500,000 |
DM |
| Replacement of Two Water Towers |
901311 |
|
4/21/09 |
$2,500,000 |
DM |
| Residential Life Facilities - Hale and Ellsworth Halls Elevator Replacement |
201511 |
|
11/5/09 |
$1,600,000 |
Departmental Funds |
| Residential Life Facilities - Holcomb, Whitney, Sprague Masonry Repairs |
901471 |
|
11/5/09 |
$775,000 |
Departmental Funds |
| Residential Life Facilities-Shippee Hall Elevator Replacement |
901449 |
|
11/18/08 |
$600,000 |
UCONN 2000 |
| Residential Life Facilities-Sprinkler Installation & Miscellaneous Repairs at Mansfield Apartment Complex |
901284 |
|
6/23/09 |
$4,000,000 |
Departmental Funds |
| Residential Life Facilities-Sprinkler Installation & Miscellaneous Repairs at Northwood Apartment Complex |
901283 |
|
6/23/09 |
$3,000,000 |
Departmental Funds |
| Residential Life Facilities - Window Replacement Graduate Residence Halls |
201524 |
|
11/5/09 |
$2,300,000 |
Departmental |
| Residential Life Facilities-Window Replacement Project for Holcomb, Whitney, Sprague, Shippee, Grad Dorms and Northwood Apartments |
901450 |
|
6/23/09 |
$2,000,000 |
Departmental |
| Residential Life Window Replacement Project for Alumni Quad and Buckley Hall |
201438 |
|
4/15/08 |
$2,100,000 |
Departmental |
| Residential Life Window Replacement Project for Hale Hall, Ellsworth Hall, West Campus & Brien McMahon Hall |
201309 |
|
11/18/08 |
$3,071,600 |
Departmental Funds |
| Roof Repair & Rehabilitation-Monteith Hall |
901155 |
|
11/15/05 |
$250,000 |
DM |
| Ryan Refectory Renovations |
901167 |
|
11/14/06 |
$2,970,000 |
DM |
| SCADA (Supervisory Control and Data Analysis) System |
901196 |
|
1/22/08 |
$1,300,000 |
DM |
| School of Engineering Renovations |
901508 |
|
9/22/09 |
$1,411,000 |
DM, Departmental, Eminent Faculty |
| School of Pharmacy/Biology Completion |
900330 |
|
1/31/06 |
$94,609,000 |
UCONN 2000 |
| Security Upgrades - Hilltop Apartments |
201505 |
|
6/23/09 |
$800,000 |
Departmental |
| Sewage Treatment Plant Clarifier Repairs |
901192 |
|
2/27/08 |
$1,190,000 |
DM |
| South Campus Express Line Modifications (Water & Sewer Distribution) |
901316 |
|
9/22/09 |
$500,000 |
DM |
| South Campus Fire Alarm Upgrade (2nd Revised) |
901269 |
|
4/15/08 |
$667,085 |
DM |
| South Garage Slope and Ramp Repair |
901178 |
|
4/21/09 |
$607,200 |
DM |
| Stamford Campus Carpet Replacement |
901334 |
|
12/4/07 |
$657,504 |
Operating Funds |
| Stamford Campus Improvements-Parking Garage Repairs |
901090 |
|
6/19/07 |
$435,000 |
UCONN 2000 |
| Steam & Condensate Distribution System Replacements-Phase I |
901317, 901372, 901421 |
|
4/21/09 |
$5,525,000 |
DM |
| Storrs Hall Addition |
901265 |
|
6/23/09 |
$14,000,000 |
UCONN 2000 |
| Street Construction/Sidewalk Repairs and Related Improvements - Phases I & II |
901318 |
|
6/23/09 |
$2,600,000 |
DM |
| Student Union Addition |
900576 |
|
6/20/06 |
$70,755,303 |
UCONN 2000 |
| Student Union Quadrangle Site Work and Landscape-Phase I |
901101 |
|
6/19/07 |
$1,400,000 |
DM |
| Student Union Quadrangle Site Work and Landscape - Phase II |
901440 |
|
9/23/08 |
$1,000,000 |
DM |
| Support Facility (Architectural and Engineering Services) |
901390 |
|
9/23/08 |
$500,000 |
UCONN 2000 |
| Tie In Drum Heater on Boilers at CUP (Central Utility Plant) |
901319 |
|
2/27/08 |
$600,000 |
DM |
| Torrey Life Sciences Code Correction |
901260 |
|
12/4/07 |
$500,000 |
DM |
| Torrey Life Sciences Fire Alarm Replacement |
201503 |
|
6/23/09 |
$547,000 |
Plant Funds |
| Torrey Life Sciences Relocation |
901158 |
|
9/20/05 |
$645,000 |
DM |
| Torrey Renovation Completion & Biology Expansion |
900705 |
|
6/24/08 |
$125,000,000 |
UCONN 2000 |
| Torrington ADA Improvements |
901201 |
|
6/19/07 |
$650,000 |
DM |
| Torrington Campus Improvements - Phase I |
901375 |
|
6/24/08 |
$500,000 |
UCONN 2000 |
| Waterbury Campus Property Transfer (Old Campus) |
901097 |
|
9/22/09 |
$1,180,000 |
DM & Departmental |
| Waterbury Downtown Campus - Courtyard Landscaping and Art Work |
901179 |
|
4/21/09 |
$800,000 |
UCONN 2000 & Gifts |
| Water Reclamation Facility |
901229 |
|
8/4/09 |
$28,598,000 |
DM & Plant Funds |
| West Hartford Campus Renovations/Improvements-Electrical Switchgear Replacement |
901286 |
|
6/23/09 |
$800,000 |
UCONN 2000 |
| West Hartford Campus Renovations/Improvements-Parking Lot |
901110 |
|
8/2/05 |
$850,000 |
UCONN 2000 |
| West Hartford Campus Renovations/Improvements - Phase I |
901285 |
|
4/21/09 |
$1,500,000 |
UCONN 2000 |
| West Hartford Campus Renovations/Improvements-School of Social Work Building Envelope Repair |
901524 |
|
9/22/09 |
$1,000,000 |
UCONN 2000 |
| Wilbur Cross Facade Repairs |
901185 |
|
4/15/08 |
$1,754,500 |
DM |
| Willimantic River Water Transmission Line-Partial Replacement |
901062 |
|
9/26/06 |
$712,819 |
DM |
| Window Replacement Project for Hale, Ellsworth and McMahon Halls & West Campus |
201309 |
|
11/14/06 |
$3,050,000 |
Departmental Funds |
| Young Building Renovation/Addition |
901373 |
|
6/24/08 |
$10,000,000 |
UCONN 2000 |
|
|
|
|
|
|
Health Center: |
Project # |
Phase |
Approved |
Budget |
Primary $ Source |
| 800 Mhz NMR Installation |
08-014 |
|
11/5/09 |
$2,900,000 |
UCHC Capital & Grant Funds |
| Academic Building (Bldg. A) Roof Replacement |
07-601.10 |
|
6/23/09 |
$1,050,000 |
DM |
| Academic Research Building Heat Pipe Replacement |
08-601.01 |
|
6/24/08 |
$1,250,000 |
DM |
| Administrative Services Building Renovation to Medical Services Building |
04-6521 |
|
9/25/07 |
$18,000,000 |
UCHC Capital |
| CLAC Renovation Biosafety Level 3 Lab |
901133 |
|
6/20/06 |
$14,000,000 |
UCONN 2000 |
| Cooling Coil Conversion |
06-704 |
|
12/4/07 |
$1,408,000 |
DM |
| Cooling System - Chiller #2 Replacement |
09-603.02 |
|
6/23/09 |
$1,350,000 |
DM |
| Cooling Tower Replacement |
|
|
9/20/05 |
$1,818,600 |
DM |
| Datacenter Infrastructure Improvements |
09-603.01 |
|
6/23/09 |
$1,800,000 |
DM |
| Dental Implant Center Renovation |
06006938 |
|
9/25/07 |
$2,555,000 |
UCHC Capital |
| Dental School Renovation -Preclinical Teaching & Prosthetics Labs |
901212 |
|
11/5/09 |
$2,305,000 |
UCONN 2000 |
| Dowling North Renovation |
07-070 |
|
12/4/07 |
$905,000 |
UCHC Capital & UCONN 2000 Equipment |
| Electric Heat Conversion Project |
07-604 |
|
2/27/08 |
$1,620,000 |
DM |
| John Dempsey Hospital 2nd Floor-ICU Renovation |
|
|
11/15/05 |
$1,546,000 |
UCHC Capital |
| John Dempsey Hospital 4th Floor Renovation |
|
|
11/15/05 |
$800,000 |
UCHC Capital |
| John Dempsey Hospital Electro Physiology Lab & Catheterization Lab Renovation, Phase I&II |
|
|
4/11/06 |
$5,205,000 |
UCHC Capital |
| John Dempsey Hospital Emergency Department Expansion |
07-038 |
|
3/10/09 |
$1,280,000 |
UCHC Capital |
| Library/Student Computer Center Renovation |
901223 |
|
4/15/08 |
$1,216,491 |
UCONN 2000 & Gifts |
| Main Building Exterior Facade Joint Sealant Replacement |
08-603.01 |
|
6/24/08 |
$3,300,000 |
DM |
| Main Building Renovation ($75M budget to be revised to $72.71M in the future) |
901134 |
|
6/20/06 |
$75,000,000 |
UCONN 2000 |
| Main Building Renovation-Clinical Skills Renovation |
901211 |
|
4/10/07 |
$1,400,000 |
UCONN 2000 |
| Main Cooling System Back-Up Chiller Replacement |
6006894 |
|
2/27/08 |
$935,000 |
DM |
| Medical Arts and Research Building Lab Fit-Out |
07-009 |
|
3/13/07 |
$560,000 |
UCHC Capital |
| Medical School Academic Building Renovation-Patterson & Massey Auditoria |
901136 |
|
9/26/06 |
$4,350,000 |
UCONN 2000 |
| Munson Road Reconfiguration-Phase I |
|
|
1/31/06 |
$2,100,000 |
UCHC Capital |
| Munson Road Renovation and Expanded Parking |
05-006770 |
|
9/25/07 |
$4,350,000 |
UCHC Capital |
| Negative Pressure Room - Building 4 Renovations |
07-082 |
|
11/18/08 |
$590,000 |
Research Funds |
| Research Tower |
901132 |
|
1/12/09 |
$51,565,000 |
UCONN 2000 |
| Support Building Addition/Renovation |
5006797 |
|
8/1/07 |
$7,800,000 |
UCONN 2000 |
| Tomotherapy Equipment Installation |
05006842 |
|
3/13/07 |
$4,300,000 |
UCHC Capital |
Updated:
10/27/09
|